Siam Oriental Oasis

Слайд
Слайд
Слайд
Слайд
Слайд
Слайд
שטח הקרקע м2
מספר בניינים 3
מספר קומות 8
תחילת הבנייה 0000 שנה
סיום הבנייה 0000 שנה

תיאור

Good afternoon! We are glad to inform you that we have announced the start of sales for 12th project of Siam Oriental complex

Project infrastructure:
Underground parking under the entire project area
2 swimming pools (one on the ground floor, the second on the roof top)
2 saunas (Finnish and Turkish)?
Fitness
co-working
A recreation area (tables, chairs, sun beds)
Greenery will be planted around the project as well as on the building façades and on the roof?

The project will consist of 3 eight-storey buildings. A total of 377 apartments with different unit plans  from studios to 4-bedroom apartments.

Construction is scheduled to begin in the 2nd quarter of 2025.
Completion of construction December 2027
 

רוצים לדעת עוד על Siam Oriental Oasis? צרו קשר עוד היום!

Картинка

תוכנית אב ומפה

תוכנית אב של הפרויקט

תשלומים (ללא תוספת תשלום)

  Payment plan
Deposit 100.000 (included in the price of the apartment)
During the month: 20% (- 50,000 of the deposit)
Construction will be started: 20%
Construction will be in 7th floor 20%
Outside brick walls in 6th floor 20%
Construction is completed ( keys) 20% (-50,000 of the deposit)

אנחנו יכולים לעזור לכם למכור את הנכס שלכם בפאטאיה

מלאו את הטופס ואנחנו נתחיל מיד לחפש קונה

מעדיף לתקשר דרך מסנג'רים
בלחיצה על הכפתור, אתה מאשר את מדיניות הפרטיות
0 ❤️